76
General Questions and Answers / Setting parallel in Job manager?
« on: November 3, 2015, 10:29 »
I have a license for 4 nodes (1 master, 3 slave). However the system is a local one (2xCPU - 12 cores each).
Is it possible to set from the job manager by default that all my calculations use the full number of nodes.
In short in-stead of doing 'mpiexec -n 4 ...' each time , can I config somehow the job manager to do it for me?
Is it possible to set from the job manager by default that all my calculations use the full number of nodes.
In short in-stead of doing 'mpiexec -n 4 ...' each time , can I config somehow the job manager to do it for me?